Flowpoint grout being worked into paving joints with a squeegee

How to

How to use Flowpoint grout.

Six steps and no special tools. This is the maker's method, with tips for Australian weather. At 20°C the paving takes foot traffic about an hour after you finish.

About Flowpoint groutCall 03 9720 4633

Step by step

Six steps.

What you need: a bucket, a drill with a paddle mixer, a rubber or neoprene squeegee, a soft brush and a hose with a gentle spray. The paving should already be bedded and set.

  1. Prepare the joints

    The paving should be bedded and set. Clear the joints of debris to at least 20 mm deep and remove any standing water.

  2. Soak the surface

    Wet the paving and the joints thoroughly and keep them damp until you finish. This stops the stone drawing water out of the grout.

  3. Mix

    Pour clean water into the bucket first, about 4.25 litres for a 25 kg bag (check the bag), then add the powder. Mix with a paddle for 3 to 5 minutes until it is smooth with no lumps.

  4. Pour and work it in

    Pour it onto the paving and squeegee it into the joints straight away. Keep moving it over the surface to top up any joints that settle.

  5. Squeegee off

    Pull off as much surplus as you can and keep the surface moist with a soft mist of water.

  6. Wash clean

    When the grout has firmed (press a fingertip in: no print means it is ready), brush and wash the surface with plenty of water until only clean water runs off.

Flowpoint grout poured across natural stone paving
Pour it across wet paving.
Flowpoint grout being worked into paving joints with a squeegee
Squeegee it into the joints.
Washing surplus Flowpoint grout off paving with a hose
Wash off with plenty of water.

Australian weather

In the heat.

Pick your time

Work in the early morning or late afternoon, out of the direct midday sun. Warm weather speeds the set and cool weather slows it.

Small batches

Only mix what you can place in about 4 minutes. Never remix it or add water once it starts to stiffen.

Keep it damp

Keep the paving damp throughout and mist it if it starts to dry.

Watch the rain

Don't lay it if rain is about to pool on the fresh joints.

Store it right

Keep the bags cool and dry, between 5°C and 30°C.

Try a patch first

Porous or textured stone can behave differently. Instarmac recommends a small trial patch before you do the whole job.

How many bags?

A 25 kg bag makes about 13.9 litres of grout. Tell us your area, your paver size and the width and depth of your joints, and we'll work out how many bags you need.

Call 03 9720 4633About Flowpoint grout

UltraScape, an Instarmac brand

Good to know

How-to questions.

What tools do I need to use Flowpoint?

A bucket, a drill with a paddle mixer, a rubber or neoprene squeegee, a soft brush and a hose with a gentle spray.

How much water do I mix with Flowpoint?

About 4.25 litres of clean water for each 25 kg bag. Put the water in the bucket first, then add the powder. Check the bag for the exact amount.

Can I lay Flowpoint in summer?

Yes, but heat shortens the working time. Work in the early morning or late afternoon, keep the paving damp, mix small batches and never add water once it starts to stiffen.

When is Flowpoint ready to wash off?

When it has firmed in the joints. Press a fingertip into a joint: if it leaves no print, brush and wash the surface with plenty of water.

What do I do with the washings?

Plan a run-off area before you start. Cement washings must not go down a stormwater drain.

How long before I can use the paving?

At 20°C, light foot traffic after about 1 hour and vehicles after about 4 hours.